Assistant Site Manager
Role overview:
To assist the person responsible for the delivery of an allocated project to the highest standards of Quality, Health and Safety, on time, and within budget. Through excellent leadership, motivation and teamwork, the highest standards are to be strived for and attained. Quality of product and pride in presentation are to be upheld at all times. Adhere to and engage with QA/ISO system and other company procedures.
Role Scope:
This should be read in conjunction with the authorities’ chart that forms part of the ISO production manual.
When trusted to run a standalone scheme as part of personal development site manager authorities will be extended
Key Internal/External Relationships:
Internal: Contracts Manager, Project manager, Senior Site Manager, Site Manager, Technical Co-ordinator, Contracts Surveyor, Sales Managers (where applicable)
External: Clients, Sub-contractors, consultants, statutory bodies, affected residents
Key Results Areas:
1. Health & Safety
Ensure compliance with H&S legislation, policies, safety plans, risk assessments and method statements
Ensure the project (site) is never left unattended without appropriate cover
Educate and act immediately and accordingly to ensure desired behaviour of all site personnel
Strive to achieve above acceptable site scores
Stop any bad practices immediately and embed a ‘don’t walk by’ culture on your site
2. Quality
Maintain quality control using ISO systems including continual update of quality system on SnagR
Take part in sub-contractor performance reviews with the project team
Issue sub-contractor notice of non-conformance
Issue materials notice of non-conformance
Provide detailed customer care information immediately to drive 5 star NHBC scores
Provide information on reported defects to minimise our exposure and to protect our relationship with customers
To assist in the control of the site on a daily basis and implement policies and objectives effectively as advised by Site Manager or company procedure
To organise and control the construction of the development in accordance with the drawings, schedules, ERs, and specification provided and the construction programme
To ensure that the construction complies with the relevant NHBC, Zurich or other warranty organisations and statutory authorities
Review issued drawings and ensure they are complaint and deliverable
Ensure site is clear, tidy, and compliant with corporate standards – at all times to an exemplar standard
Maintain boundaries in a condition that are best in class via continual daily/weekly checks
3. Delivery
Assist in delivering the project on time and to pre-determined time targets
Ensure you understand, comply, and coordinate the management of site preliminary expenditure in accordance with approved budgets
To assist in carrying out the construction in the most effective manner and deal with all obstacles efficiently and appropriately
To drive liaison with stats companies to ensure timely connections and understand the timescales involved
To hold effective sub-contractor meetings and record/distribute minutes of the meeting
Prepare short term programme and issue formally, in liaison with the Site Manager
Order, plan and schedule material delivery requirements and prepare accurate and timely material requisitions, in liaison with the Site Manager, to enable efficient construction processes, enabling buyers enough time to attain the best rates, minimising unnecessary storage on site whilst having sufficient on site to keep up with programme and complete work packages
Prepare plant requisitions with the information needed to enable the best solution to be concluded
Handover completed scheme to client on time, to agreed quality standard and budget
4. Financial
Keep within preliminary budgets
Keep costs under control, by ensuring works are done once and done well
Engage in consultation with Contract Surveyor including at sub-contract tender stage
Prepare material take-offs and call-off schedules accurately in a timely manner to enable the best price
Minimise material requisitions by accurately forecasting requirements
Maintain an accurate weekly materials received sheets
Maintain an accurate monthly hired and owned plant record sheet
Compile accurate labour allocation sheet and issue to Contract Surveyor to enable cost to be passed on to others
5. People
To motivate, control/set targets, and appraise performance to ensure all personnel are working individually and as a team to effectively achieve the build programme
To deal effectively with any poor standards appropriately, whether internal or external personnel, to ensure site is functioning efficiently, to the agreed programme, safely and to budget
To work in partnership with other departments and proactively drive communication and problem solving with them so you can achieve plan, using clear communication showing leadership and taking ownership of issues
Success Measures:
Comply with company health and safety policies and rules and effectively demonstrates supervisory/management responsibilities.
Aware of own actions and intervene to correct health and safety breaches as they occur
Proactively assists in the delivery of the project to programme, including demonstrating the required status reporting, preparation and issuing of short-term programme and forward planning
Demonstrates the ability to foresee any potential issues and the implementation of corrective action to mitigate delay
Ensures key elements such as material requisition, plant requisition & stats booking are delivered to programme dates
Contract Quality Plan is adhered to and that our SnagR processes are fully implemented and always up to date
Construction and development is controlled in accordance with the drawings, schedules , ERs and specification provided
Construction complies with the relevant statutory bodies and relevant legislation
Quality inspection are carried out and records completed as required and that our supply chain equally fully implemented via SnagR
All budgets and expenditure, including preliminary, labour budgets and schedules are managed to meet plan
The project team is managed effectively and work in a collaborative way to reach target
Everybody on site is treated with dignity and respect, and have equality of opportunity
Skills, Experience and Attributes:
Level 4 (HNC/NVQ4) minimum or suitably experienced tradesperson with considerable experience of the full range of construction trades
SMSTS
CSCS
First Aid
FAAW
PASMA
SMARTWaste
Fire Marshall
Manual handling
Scaffold Awareness
Lifting Operations
Traffic Management
Crane Rescue
Fire Stopping
Asbestos awareness
UXO (bomb) Awareness
Good understanding of Health and Safety procedures and legislation applicable to the construction industry
Experience of Traditional Construction, RC Frame and Timber Frame construction
Previous experience of project delivery preferred
Can demonstrate knowledge of project reporting requirements, project planning, issue mitigation and requisition management
Experience and knowledge of Construction Quality and Compliance requirements, including ISO and quality inspections
Knowledge of the relevant statutory bodies, NHBC and legislation
Demonstrates the ability to manage budgets and expenditure (preliminary, labour, materials) within budget
Demonstrate an understanding of the sub-contractor order to minimise sub-contractor variation instructions
Has experience of engaging and consulting with contract surveyors, sub-contractors and relevant partners/stakeholder to work collaboratively to deliver the project
Has the ability to effectively lead and motivate a team
Confident in explaining technical information
Strong time management skills and excellent problem solver
- Department
- Special Projects
- Locations
- Aylesbury FDS C
Assistant Site Manager
Loading application form